Rail Relay Phase 2: Preparing for Installation
Mid-Continent Railway Museum’s trains have traveled the rails at North Freedom for 60 years… rails which are themselves often over 100 years old. Mid-Continent’s railroad track is a critical piece of infrastructure that makes possible our museum’s signature experience – the train rides! Now we are asking for your help to make sure Mid-Continent’s rail line remains safe to operate for another 60 years and beyond.
MCRY Rail Relay Phase 2 is the next crucial step in addressing old, worn, and fatigued rail along Mid-Continent’s rail line on which its demonstration passenger trains are operated. Phase 2 involves replacing 11,431 track feet (2.16 miles) of rails, joint bars, tie plates, rail anchors, track bolts, and spikes, known as On-Track-Material, or OTM. That is enough rail to replace over half of Mid-Continent’s entire railroad!
Rail Relay Progress Made So Far
Thanks in large part to the generosity of donors who have given so far, Mid-Continent was able to place a winning bid on 502 tons of rail and 138 tons of OTM at a total cost of $203,000. The rail was recently removed from the Wisconsin & Southern Railroad’s Prairie Subdivision as they upgraded that line. This has provided enough rail to allow Mid-Continent to complete all of Phase 2. Although the rail being purchased comes used, it is newer and heavier-duty rail than what exists on Mid-Continent’s current line and will be good for many decades in service for the museum. The purchased rail was transported to the museum in November and early December 2023.
Next Steps
In April 2024, crews began sorting the rail in preparation for placing (but not yet installing) the rails along Mid-Continent’s line. In summer 2024, Mid-Continent will prepare a bid package, requesting bids from railroad construction contractors for swapping out the old rail with the new rail.
Your Help is Needed for the Rail Relay Phase 2 Project!
Now that Mid-Continent has acquired the rail, it is time to install it. Although Mid-Continent’s volunteers accomplish a great deal, the scale of the work to be performed can only be achieved with the help of a railroad construction contractor. This means donations are needed to bring the project to completion. Depending on contractor availability, the target is for this to happen during fall/winter 2024.
Your donation to the Rail Relay Phase 2 project directly supports Mid-Continent’s core mission of providing an immersive museum experience of riding aboard historic railcars on an authentic, rural branchline route. Join Mid-Continent today in preserving America’s railroading legacy for tomorrow.
How to Make Your Donation
Mid-Continent Railway Museum is a 501(c)(3) not-for-profit, educational entity. All donations are tax-deductible.
You can make your donation in one of several ways:
- Click the Donate Now button to be taken to the project’s PayPal donation page. This method accepts credit and debit cards, as well as PayPal payments.
- Send a check to with “Rail Relay Project” written in the memo line to
Mid-Continent Railway Museum
PO Box 358
North Freedom, WI 53951-0358
- Speak to one of our office staff by phone at 608-522-4261 or 800-930-1385 to make a payment by phone or if you have any questions.
Tips for Maximizing Your Impact
Consider asking your employer if they match donations to 501(c)(3) nonprofit organizations. If you’re retired, ask your financial advisor if donating a portion of your retirement account’s required minimum distribution (RMD) is right for you.