New Pilot Completed
The new pilot has been completed and delivered. The pilot was built by Roger Hugg in his shop at his home in Elroy.
Also, the boiler patches and rear tube sheet are fitted and tacked to the boiler. We now wait for the fit-up inspection.
The front coupler, pilot beam and deck plate have been removed. The new timber for the pilot beam has been purchased and Roger Hugg has delivered it.
The fireman’s side piston and cylinder head have been removed so inspection of the piston, cylinder and rod can begin.
Thanks to Roger Hugg, Jeff Lund, Bob Ristow, Dave Lee, Kelly Bauman and Jim Connor.