Mid-September 2019 Boiler Update
With structural welding and the post-weld heat treatment complete, the next step on Chicago & North Western #1385’s boiler progression was sandblasting and painting. This step was recently completed as seen in these photos supplied by Continental Fabricators. Paint has only been applied to the inside of the boiler at this stage. The exterior will be painted a bit later in the process.
- Closer view of C&NW #1385 front tube sheet after being sandblasted. Photo courtesy Continental Fabricators.
- Peering inside C&NW #1385’s freshly painted interior of the new boiler. This view is looking in from the front of the boiler toward the rear tube sheet and firebox. Photo courtesy Continental Fabricators.
The paint is APEXIOR No. 1, a product that has been used in locomotive boilers going back many decades and is proven effective and typically lasts for decades. The paint is designed to withstand continuous immersion in boiling water and steam up to 698°F (370°C). It serves to aid in preventing corrosion and scale buildup in the boiler by preventing the boiler water from touching the metal of the boiler shell.
Next on the to-do list: rolling boiler tubes.