Mid-May 2019 Boiler Progress
Here are the latest photos of C&NW #1385’s new boiler, courtesy of Continental Fabricators in St. Louis. The photos were taken on May 20, 2019.
The backhead stays are all installed and they are currently completing welding on them.
The right and left side sheet stays are progressing as well.
The large horizontal braces that were previously attached to the outsides of the side sheets and backhead are now being removed as progress continues. The braces were installed temporarily to prevent warping from the heat generated during welding.
The throat sheet – the sheet that connects the firebox to the bottom of the boiler barrel – has all of its rigid stays installed and is in the process of welding.