After the caissons were drilled down into bedrock, a heavy reinforcing steel cage was lowered into the caisson. The reinforcing is designed to resist flood forces, ice impacts, and the force of the train starting and stopping on the bridge. All of these forces are attempting to overturn the pier and some of them are rather large forces, so the amount of reinforcing steel required is substantial. Pete Schierloh photo.
Continue reading →