A view of the existing through plate girder (TPG) span that will be preserved resting on a temporary support bent after the existing timber Pier 2 was demolished. Visible near the water surface are the tops of the permanent steel casing for the two 7’-0” diameter drilled caissons that form the foundation of replacement Pier 2.
Continue reading →