Dome Surfacing Machine
New member Randy Way, Jim Connor, and Bob Ristow where able to set up the dome surfacing machine enabling truing of the gasket surface. Mark Jones joined Bob on Sunday, the ‘cut’ on the dome was dressed up and a ‘new’ storage box was built for the surfacing machine. The new box is about 3/4 the size of the old one and will facilitate storage since it can now fit thru a door. Several front tube sheet rivets were drilled in preparation for removal.
–Bob Ristow
Jim Connor photos.