Crane Built to Assist with Restoration
Bob and Dave have built a crane to lift and position the front tube sheet for the WC&C #1. We test drove the crane last week.
Welding on the rear sheet continues as well as work on the frame and running gear. During Snow Train™ weekend, riveting the mud ring was started.