July 10-11, 2004 WC&C #1 Work Session
The turnout was light for the July session. Rick Peters got at least one more binder fit up on the frame to facilitate alignment and also removed the engineer’s side piston from the rod so the piston can be built up and machined to proper size. Steve Seibel and Kelly Bauman helped get the steel frame under the smokebox and we made another step in getting the 2nd course patch fit in. It may seem slow but positive steps are being made all the time.