Riveting Work Weekend
Work this weekend included installing 8 rivets in the WC&C #1 fire box patch. Friday afternoon and Saturday morning was spent in preparation. A backer plate was fabricated. Then a test plate with 4 holes was formed and used to determine the rivet length needed. All the tools were lined up and test hole riveted. Testing went perfect and all 8 rivets in the patch were installed in an hour and 15 minutes.
Rivet crew of five; Bob Ristow, Pete Deets, Roger Hugg, Ed Ripp and
Jim Connor.
Pictures show Pete Deets welding on the backer plate. Pete and Bob Ristow reaming rivet holes. Ed Ripp running the rivet gun. Completed patch with 8 rivets installed. The patch will be welded in place in the near future. Also a picture of Bob’s progress on the boiler check valves.
–Jim Connor