Connection between engineer side branch pipe and superheater header prior to installation of “donut.” Pete Deets photo. June 27, 2021 at SPEC Machine.
Top of C&NW #1385 branch pipe (black) on engineer side. This side will also be receiving a “donut” to close the gap to create a steam-tight seal between the branch pipe and superheater header.